Written quote within one business day, across Toronto and the GTA
15 service areas Toronto and the 905 Written quotes One crew

Where Toronto Flooring Co works

Toronto Flooring Co works across the six former Toronto municipalities and the surrounding 905, and we price each area by the buildings in it rather than by the drive.

Six former Toronto municipalities
Nine 905 and neighbourhood areas
Condo and low-rise both covered
Board packages prepared for towers

Is your street on the list?

Tell us the intersection and the building type. We will confirm coverage and book a measure.

What can we help with?

So the right crew reviews your project.

Any workmanship warranty is set out in your written quote, job by job.

Toronto

The six former municipalities and the neighbourhoods inside Old Toronto. Housing age here runs from 1860s bay-and-gables to 2020s towers, and the floor changes with it.

376,237 residents, 123.93 km²

Etobicoke

Wartime Strawberry Box houses in Alderwood and Queensway Park, lakeshore Mimico and New Toronto, and Rexdale towers on slab.

Flooring in Etobicoke

Around 683,511 residents

North York

Post-war suburbia and Don Mills, planned 1952 to 1965, sitting right on the plank-to-plywood subfloor transition.

Flooring in North York

623,610 residents

Scarborough

Last-third-of-century subdivisions on plywood and OSB, with a 19th-century layer along Kingston Road and Danforth Road.

Flooring in Scarborough

116,399 residents, 21.26 km²

East York

Post-war veterans' housing around Topham Park, and second-storey additions that meet original floors at a height mismatch.

Flooring in East York

Humewood, Silverthorn, Weston

York

1910s housing forty years older than North York's, on the steep Silverthorn and Fairbank streets where material is carried, not wheeled.

Flooring in York

275,931 residents, 16,608 per km²

Downtown Toronto

Bay-and-gables on 12 to 25 foot frontages, and condo towers where the board package matters as much as the plank.

Flooring in Downtown Toronto

Balmy, Scarboro, Kew, Woodbine

The Beaches

Converted summer cottages beside full Edwardian houses, and two Heritage Conservation Districts that do not control your interior.

Flooring in The Beaches

Built out 1927 to 1941

Leaside

The most predictable floor in Toronto, because the whole neighbourhood went up inside one narrow window.

Flooring in Leaside

Developed after 1900

High Park

Detached and semi-detached houses with real room widths, which is where wide plank actually works.

Flooring in High Park

The GTA

Six 905 municipalities. The useful question in all of them is the build decade, because it decides whether you are standing on planks, plywood, OSB or a slab.

717,961 residents

Mississauga

Mostly built out by 2005, so it is a subfloor-thickness and slab-flatness conversation, with Port Credit and Streetsville the older exceptions.

Flooring in Mississauga

Grew 80.2% from 1996 to 2006

Vaughan

An unusual share of the housing went up inside one decade, on engineered joists and OSB. Kleinburg and Woodbridge are the exception.

Flooring in Vaughan

338,503 residents

Markham

A post-1970s city with two 19th-century heritage main streets inside it, Unionville and Markham Village.

Flooring in Markham

202,022 residents

Richmond Hill

The northern third sits on the Oak Ridges Moraine, whose porous terrain creates high water tables. That is a basement slab test, every time.

Flooring in Richmond Hill

656,480 residents

Brampton

1950s Bramalea and 1990s-onward Springdale are two different subfloor generations in one city.

Flooring in Brampton

Ontario's largest town

Oakville

Old Oakville's 19th-century lakeshore houses and Glen Abbey's later subdivisions are a century of floor construction apart.

Flooring in Oakville

All service areas

Every area we cover, with the flooring problems specific to its housing stock.

Why the area changes the quote

Build decade decides the subfloor

Pre-war Toronto is diagonal board subfloor. The 1950s and 60s are the plywood transition. Late-century suburbs are plywood and OSB. Post-1996 builds sit on engineered joists. Each one takes a different fastener and a different deck check.

Building type decides the paperwork

A house needs a measure and a quote. A condo needs the corporation's current rules, a product data package, an insurance certificate, a WSIB clearance, an elevator booking and a working-hours window. We do not price those the same way.

Access is a real line item

A third-floor walk-up on a 12-foot frontage downtown, or a hillside lot in Silverthorn, means material is carried by hand. We say so in the quote rather than absorbing it and then rushing the install.

Fifteen areas, four subfloor generations

The useful map of Toronto flooring is not a map of neighbourhoods. It is a map of build decades, because the decade decides what is under your feet and therefore what the job costs.

Pre-1945 Toronto, which is most of downtown, York, the older Beaches streets and the Kingston Road corridor in Scarborough, is diagonal board subfloor over dimensional joists. Boards move, squeak and need refastening before anything new goes down, and the houses are narrow, which limits plank length and makes stairs a material-handling problem before it is a finishing one.

The late 1940s through the 1960s, which is East York, most of North York and the Etobicoke wartime pockets, is the plywood transition. Some of it is still board, some is early plywood, and the only way to know is to open a bay.

The last third of the century, which is most of Scarborough, Bramalea and the first wave of Mississauga, is plywood and OSB. Here the question is deck thickness against joist spacing, because OSB has to be thicker than plywood for the same fastener holding power.

Post-1996, which is Vaughan’s boom decade, Springdale in Brampton, Cornell and Berczy Village in Markham and most of north Oakville, is engineered joists and OSB. Squeaks in these houses have a different cause than squeaks in a 1920s semi, and diagnosing them by the same method wastes your money.

Then there are the slabs

Every condo tower, every basement and every slab-on-grade build is its own category regardless of the neighbourhood. Concrete holds moisture for a long time, and the only evidence a flooring manufacturer accepts is an in-situ relative humidity test: a probe drilled into the slab and left to equilibrate for at least twenty-four hours. A surface meter reading is not that test. In Richmond Hill’s northern third the moraine’s high water table makes the test non-negotiable, and it frequently rules out solid wood in a basement there.

What we bring to the first visit

A moisture meter, a concrete probe kit, a six-foot and a ten-foot straightedge, and a light for the joist bay. That is the whole basis of an honest flooring quote in this city, and it takes under an hour.

Coverage questions

Do you charge more for the 905?

Not for the drive. What does change the price in the 905 is what you are standing on. A Springdale build from 1998 and a Bramalea bungalow from 1957 are different subfloors, and a Richmond Hill basement on the Oak Ridges Moraine needs a slab moisture test that a Leaside main floor does not. The quote follows the building, not the postal code.

My street is not listed. Can you still come?

Ask. These fifteen are the areas we cover regularly and know well enough to write a page about. We take work outside them where the job is big enough to be worth a dedicated crew day, and we will tell you plainly if it is not.

Do you work in Toronto condo towers?

Yes, and it is a different job from a house. Your corporation's rules set the impact rating the floor assembly has to meet, not the Ontario Building Code, and those rules can change on thirty days' notice to owners. Boards typically want an underlay specification, product data sheets, a certificate of commercial general liability insurance, a WSIB clearance and a renovation application before approval, then an elevator booking on top. Allow one to four weeks for the board to process it.

Which areas have the oldest floors?

Downtown Toronto and York. Cabbagetown alone has roughly three thousand houses with nearly half built during the 1880s boom, and York's Humewood-Cedarvale and Oakwood Village were developed in the 1910s. Those are plank-subfloor, plaster-and-lath houses, and in anything pre-1945 we also watch for knob-and-tube in the joist bays. If we find it, we stop and call a licensed electrician rather than closing the floor over it.

Book a measure in your area

Give us the intersection and the building type and we will bring the right meter, the right straightedge and a written quote.

Back to top