Grinding the slab before any epoxy goes down
An epoxy floor fails at the bond line or it does not fail at all. Everything that decides which way it goes happens before the first coat. The slab is ground with diamond tooling to take off the dense, power-trowelled top layer and leave an open profile the coating can key into. Acid etching is sold as an equivalent shortcut, and it leaves the coating bonded to a weak surface layer. The surface is then vacuumed rather than swept, contamination is removed instead of coated over, and the moisture is measured. Coatings want an in-situ relative humidity reading under seventy five percent, taken with a probe set at forty percent of slab thickness and left at least twenty four hours, or under three pounds per thousand square feet per day on the calcium chloride test. A slab that reads above that pushes vapour up through a cured coating and lifts it in sheets, and no amount of primer argues with it. This is why a two hundred dollar kit can peel off a Toronto garage in a season while a ground and tested floor does not. The materials in both buckets are broadly similar. The preparation is not.