Written quote within one business day, across Toronto and the GTA
Cost and timing Condo rules Subfloors and moisture Contracts and deposits

Toronto flooring questions, answered

Toronto Flooring Co gives short answers on cost, timing, condo rules and hiring a flooring contractor in Toronto. Every answer is on this page; open any question below.

Permits and condo rules
Subfloor and moisture
Contracts, deposits and cancellation
Timing and scheduling

Question not here?

Send it. We answer whether or not there is a job in it.

What can we help with?

So the right crew reviews your project.

Any workmanship warranty is set out in your written quote, job by job.

Unfinished solid oak strip flooring being installed over a plywood subfloor in an Etobicoke home
Our job: oak strip over a plywood deck, Etobicoke

Where these Toronto flooring answers come from

These are questions Toronto homeowners ask before a flooring job, and each one changes a decision or a price. Where the answer depends on a measurement we say so rather than offering a number that sounds confident and turns out to be wrong in your building.

Two points are worth stating first. The Ontario Building Code does not contain an impact insulation requirement; any impact rating comes from your condo’s own rules. And the City of Toronto’s published list of work that does not need a building permit does not mention flooring in either direction, so nobody can cite the City as saying flooring is exempt.

Rules, permits and condos

Prices, timelines and the rules that apply to Toronto floors.

Who sets the sound rules for my condo floor?

Your condo corporation does, through its rules. The governing hierarchy in Ontario runs Condominium Act, then declaration, then by-laws, then rules. By-laws need approval from owners representing a majority of units and get registered at the Land Registry Office. Rules are made by the board alone and take effect thirty days after notice to owners unless owners requisition a meeting. That is why we read the current rules rather than the copy attached to a status certificate from several years ago.

What happens if I install a floor my board has not approved?

Your neighbour's route to a remedy becomes expensive, which makes it expensive for you. Flooring disputes between condo neighbours can end up in mediation and arbitration under the Condominium Act, which costs far more than getting the assembly right the first time.

Does a Heritage Conservation District stop me changing my floors?

No. The City of Toronto states in writing that changes to the interior, changes to the exterior that are not visible from the street, and routine maintenance like painting do not require a heritage permit. No Heritage Conservation District controls your floor on its own. The single exception is a property whose own designation by-law specifically describes interior heritage attributes.

Subfloors, moisture and squeaks

How thick does my subfloor have to be?

It depends on how far apart your joists are. The Ontario Building Code sets minimum subfloor thickness against support spacing, and the requirement steps up as the bays widen: thicker decking is required at 610 mm spacing than at 406 mm, and oriented strand board has to be thicker than plywood for the same span. Industry guidance from the National Wood Flooring Association is stricter than the Code at the sixteen-inch spacing, and manufacturer warranties usually follow the industry number rather than the Code minimum. We measure the spacing before recommending a material.

What is an in-situ slab test and why does it take a day?

It is a relative humidity probe drilled into the concrete rather than a reading taken off the surface. The probe goes to forty percent of slab thickness where the slab dries from one side, or twenty percent from each side where it dries from two, and it has to equilibrate for a minimum of twenty-four hours before the reading means anything. Surface meters read the top few millimetres, which is the driest part of the slab and the least informative. The number matters because resilient and vinyl products typically want the slab at 75 to 80 percent or lower, wood usually under 75, and epoxy under 75.

Why does screwing down a squeaky board not fix it?

Because in most older Toronto houses the squeak is not in the floor you can see. Solid board subfloors were common here before the plywood era, and a board that has worked loose from its joist rubs against its nail under load. A screw driven through the finish floor into the same loose board treats the symptom at the wrong layer and usually returns within a season. The fix is finding the moving board and refastening it to the joist, which is also why the work is priced per squeak location rather than per room.

Contracts, money and timing

What has to be in a renovation contract in Ontario?

Nine things: the contractor's name, business name, address and contact details; a fair description of the work, materials and itemised products and services; warranty information for goods and labour; the total cost, payment terms and applicable taxes; a work schedule with start and completion dates; identification of subcontractors and who pays them; a payment schedule, including the deposit; and responsibility for site preparation and cleanup. Any consumer contract over fifty dollars has to be in writing at all. With us, your deposit and payment schedule are written into your quote before any work starts.

Can I cancel after I sign?

If you signed in your home, yes. A contract signed at the consumer's home is a direct agreement and carries a ten-day cancellation window with no penalty, counted from when you receive the written copy. Refunds are due within fifteen days of the cancellation notice. If work began at your request before you cancelled, the contractor may deduct reasonable compensation for non-returnable materials and labour already supplied.

How long does a floor take?

Labour on a thousand square feet of hardwood typically runs three to five days once work starts, plus acclimation time before it and drying time after any finish. A one or two bedroom condo unit usually completes in one to three days of installation, but the approval and elevator booking in front of it are the part that sets the calendar: allow one to four weeks for a board to process a renovation application. Restricted working hours in towers also stretch the schedule, since a job that takes two days in a house can take three or four in a building that bans power tools outside weekday daytime.

Still have a question?

Ask it. If the honest answer is that we need to measure something first, we will say that instead of guessing.

Back to top